Vehicle Turnaround Damages Development Land

OFFER: $8,046 . . . JURY VERDICT: $145,876

After the Take, we argued that the condemning agency overlooked damages to the 4.5 acre property caused by the road project, including:

  1. The Driveway Access will be limited to a small area on the west side of the property;
  2. A Vehicle Turnaround is carved into the property frontage, limiting driveway access;
  3. The roadway is widened from a 2-lane road to a 5-lane road, with a Vehicle U-Turn Bulge sticking into the property’s frontage;
  4. A new 2 foot x 4 foot concrete box culvert will dump stormwater runoff off the widened road pavement onto and across the property;
  5. Permanent Slopes will be created along the property’s frontage.

THE JURY VERDICT WAS 17.6 TIMES MORE THAN THE ORIGINAL OFFER

NOTE: Eminent Domain law is complex and changes frequently. Past case results do not indicate or guarantee future results.
Every case has unique facts and circumstances and must be considered on its own merits.