New Interchange Ramps Limit Future Development

BEFORE TRIAL, THE GOVERNMENT OFFERED $249,645
THE JURY VERDICT WAS $1,270,000

Commercial Highway Land Taken

THE TAKING FOR THE CIRCULAR RAMPS DAMAGES THE PROPERTY:

  • The circular ramps in the take area are elevated 65 feet to 100 feet above the existing grade, and steep slopes will extend down onto the Residue.

  • The property is chopped up, with irregular property dimensions, which reduces development efficiency.

  • There are increased costs to develop the Residue property.

  • There is a loss of internal traffic flow on the property.

OFFER: $249,645
VERDICT: $1,270,000
JURY VERDICT: MORE THAN 5 TIMES THE OFFER

NOTE: Eminent Domain law is complex and changes frequently. Past case results do not indicate or guarantee future results.
Every case has unique facts and circumstances and must be considered on its own merits.